RM450/CBM Planning Estimate · Final Warehouse Remeasurement Applies
PalletBaySABAH / B2B CARGO
FCL / BAY 03

Turn the full load into a visible plan.

FCL planning starts with the whole physical load. Container size, equipment, stuffing arrangement, route and availability still need operating confirmation.

Pallets staged beside an open container for FCL planning
PB / FCL / VERIFIED INPUTS FIRST
WORK RECORD / 02

Build the load plan before discussing the equipment

Each card describes customer-side preparation. It does not promise an operating service.

Map every pallet
01

Map every pallet

List dimensions, gross weight and stacking limits for each handling-unit group.

Describe handling equipment
02

Describe handling equipment

Record site access and the equipment thought to be needed without promising it.

Review the threshold
03

Review the threshold

Check loading height, floor transition and safe movement questions.

OPERATING REGISTER / 03

Keep these items visibly unconfirmed.

They can change by cargo, date and location. A planning page cannot decide them.

NEXT BAY / 04

Finish the count, measurements and evidence.

Once the Cargo contact channel is approved, this file can support a real operating review. It does not activate a service by itself.

Continue to quote readiness